Case Studies
Chemical Containment is proud to present the following case studies that hightlight our expertise in several areas. We also want to thank the strategic partners involved in the listed projects that provide the synergism to offer a full line of products and services.
Automotive Phosphate
Stage 2 and 4 Tank & Housing Refurbishment ProjectThe experts at Chemical Containment and Advanced Polymer Coatings were consulted to come up with a polymer lining solution for this challenging application. A plan was initiated with very innovative ideas to provide a long term lining solution to protect and prolong the life of the Stage 2 and 4 Tanks & Housings for a decade or more.
FDG Coatings In Coal Fired Power Plant
Michigan Coal Fired Power Plant - The FGD system is a 65 MW coal-fired power plant. It is equipped with an electrostatic precipitator and a wet flue gas desulfurizer (FGD) system for emission controls. The plant consumes approximately 550 tons of coal per day.